Baker Tilly Singapore

Bakertilly – Cabling, Faceplate & Rack Works

Project Scope

  • Faceplate installation at multiple locations
  • Pull data points from raised floor to network rack
  • Trace and label printer network points to server room
  • Resolve meeting room data point and install new faceplate if required
  • Mount network switch into rack at collaboration area
  • Cable management and labeling for server room racks
  • Server room housekeeping and cleanup

Similar Posts